Clearinghouse Migration Guide

Migration Steps v1.x to 2.0

1. Remove EDC

Since the EDC is no longer required, it can be safely decommissioned and removed from your deployment.

2. Verify Database Configuration

No database changes are required, but it is recommended to ensure that all connections remain functional after the migration.

3. Update Certificate Configuration

Ensure that the existing connector certificate is configured as the Clearinghouse signature certificate.

4. Update Incoming Connection Pointers

Modify any references to the old connection endpoint and point them to ch-app.